Laboratory Automation Content Hub
Get the latest expert insights from the Automata team in our collection of laboratory resources, including blogs, lab automation guides, white papers, webinars and more.
Filters
2026-05-05
Case Study
Metaphore x Automata: Scaling Complex Drug Discovery with Developer-Ready Automation
Case Studies
2026-04-21
Case Study
The Royal Marsden NHS Foundation Trust: Transforming Clinical Genomics Automation with Automata
Case Studies
2024-06-17
Case Study
Thinking beyond the benchtop instrument: use of integrated automation to enhance genomics workflows
Case Studies
Webinars
2026-03-27
Webinar
On-Demand Webinar: Scalable, Reproducible and Autonomous Cell Manufacturing with AI and Robotics
Webinars
Webinars
Webinars
Webinars
Webinars
Webinars
Webinars
2022-10-07
Webinar
On-Demand Webinar: Breaking down the journey towards the smart labs of the future roundtable
Webinars
Webinars
2023-08-06
Webinar
On-demand webinar: Thinking beyond the benchtop instruments CRISPR, COVID-19 surveillance and cancer research workflows
Webinars
Webinars
2025-04-22
Webinar
On-Demand Webinar: LINQ Canvas, simplicity and power in a single no-code workflow building tool
Webinars
2023-07-06
Webinar
On-demand webinar: Unifying science for infrastructure-level lab automation Connecting multiple labs or experiments
Webinars
Webinars
2025-03-24
Webinar
LINQ Cloud 2.0: Powering Smarter Automation, Seamless Coding, and Effortless Control
Webinars
2024-12-15
Webinar
Lab Futures Forum: Cutting-edge lab automation topics in AI-driven drug discovery and pharmaceutical innovation
Webinars
Webinars
Webinars
Webinars
No results found.
There are no results with this criteria. Try changing your search.